PORT PARAMETER
OP-1 MAX LOA 259 M MAX DWT 75.000 TONS Crude Oil & HSD
(POL PRODUCTS) MAX BEAM 44 M MAX DISPL 95.000 TONS  
  MAX DRAFT IMPORT 11.8 M    
  MAX DRAFT EXPORT 11.3    
OP-2 MAX LOA 259 M MAX DWT 75.000 TONS Chemical, Ethanol, Mollasses
(POL PRODUCTS) MAX BEAM 44 M MAX DISPL 95.000 TONS Crude Oil, Palm Oil, HSD & 
  MAX DRAFT IMPORT 11.8 M   AV GAS.
  MAX DRAFT EXPORT 11.3    
OP-3 MAX LOA 259 M MAX DWT 75.000 TONS Chemical, Ethanol, Mollasses
(POL PRODUCTS) MAX BEAM 44 M MAX DISPL 95.000 TONS Crude Oil, Vegitable Oil,
  MAX DRAFT IMPORT 11.8 M   Naptha, Base LSFO, HSFO
  MAX DRAFT EXPORT 11.3   AV GAS, MO GAS 
BERTH NO 1,2,3 MAX LOA NR Dedicated coal Berth and General Cargo/ Bulk/ Deep
  MAX BEAM NR Draft all dirty Cargoes.  
  MAX DRAFT 10.67M    
BERTH NO 4-5 MAX LOA 186 M Deep Draft/Bulk/General Cargo/Cruise Ships/ Naval Ships
  MAX BEAM NR (No dirty cargo allowed)  
  MAX DRAFT 10.50 M    
PICT MAX LOA 300 M Dedicated Container Terminal in Private Sector PICT
BERTH NO 6-9 MAX BEAM NR w.e.f  01-08-2005.  
  MAX DRAFT 12.0 M    
BERTH NO 18-21 MAX LOA 150 M General + Project cargo, Jute/Break bulk +Geared 
  MAX BEAM NR Containers  
  MAX DRAFT 9.5 M    
BERTH NO. 22-23 MAX LOA  150 M General , Jute/Break bulk +Geared   
  MAX BEAM NR Containers  
  MAX DRAFT 7.5 M    
BERTH NO.24-25 MAX LOA  N.R General + Project cargo, Jute/Break bulk +Geared 
  MAX BEAM NR Containers, Bulk Cement.  
  MAX DRAFT 10.0 M    
KICT MAX LOA 300 M Dedicated Container Terminal in Private Sector KICT
BERTH NO 26-30 MAX BEAM NR    
  MAX DRAFT 12.0 M    
       
OTHER INFORMATION  
1) There are no restriction on the beam for the general Cargo vessels when the ships are working with their own gear
2) There are no Rail served Berths on East Wharves.
3) 40 Tons shore crane available at berth No 18
4) Movement at Berth No.18 to 23 restricted to Day light only.
5) Vessel drawing draft of more than the sanctioned depth will not be allowed to enter the Port.
6) The above draught/ dimensions are subject to availability of sufficient tide/weather condition 
7)Deep draft vessels are to commence loading/discharging immediately after berthing.
8)Ship on arrival at outer anchorage are to communicate correct draught and other vessels particulars.